PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compacting around Stair -4,5-Elev. 7 Facing North-East (800x600).jpg Excavation for the underground roughing at Sprinkler room (152A) Facing South-East (800x600).jpg Finished installing metal decking at partial Derrick -3 (2nd Floor) Facing West (800x600).jpg Installing rebar columns at Elev. 5,6 (3rd Floor) Facing South-East (800x600).jpg Building rebar mats for Elev. 5,6 (3rd Floor) Facing  North (800x600).jpg Compacted and backfilled inside Stair -5 pit Facing West (800x600).jpg Finished installing temporary power to the electrical panel Facing South (800x600).jpg Material, rebar, and shear wall forms (3rd Floor) Facing West (800x600).jpg
Previous pageNext page Installing rebar columns at Elev. 5,6 (3rd Floor) Facing South-East (800x600)
Installing rebar columns at Elev. 5,6 (3rd Floor) Facing South-East (800x600)